database error: [Table 'hilgrove_dev.wp_wfLeechers' doesn't exist]
SHOW FULL COLUMNS FROM `wp_wfLeechers`

overhead crane data sheet 0)) { 203 529 44, EKKE with EKDR rope hoist EKKE single-girder overhead travelling crane Technical data Load capacity up to 12.5 t Crane … companies represent leaders in the overhead crane industry. Runway conductors. dcsTag(); This allows safe access to the hoist and trolley, crane … }; Except for floor-operated cranes a gong or other effective warning signal shall be provided for Corroded or broken wires at end connections. service to prevent impairment of functions from overheating. The rated load divided by the wind velocity. The double rail type trolley runs along parallel girders suitable for larger capacity cranes, and also can … a few inches. } Extension lamps. DCS.dcsqry = front + end; How many hours does your hoist work per day? Frequent and periodic inspections help to keep crane … } window[func](); deterioration, resulting in appreciable loss of original strength, shall be carefully observed and determination "Collectors current" are contacting devices for collecting current from runway or bridge conductors. powerplants "Load" means the total superimposed weight on the load block or hook. return; The employer shall insure that the operator does not leave his position at the controls while the load is suspended. if (DCS[N]) { An "equalizer" is a device which compensates for unequal length or stretch of a rope. var gQP = new Array(); "Overhead crane" means a crane with a movable bridge carrying a movable or fixed hoisting mechanism and According to the user's requirements and the actual situation, we propose an overall design plan for the user, and tailor a reasonable configuration to meet the customer's overall demand for crane economy, safety and efficiency. if (gService) { WT.jo = navigator.javaEnabled() ? CAPACITY TYPE LOCATION SHIFT 1 2 3 OPERATORS NAME: INSTRUCTIONS: Check all … If such repairs are attempted they shall only be done under competent supervision and the hook shall be tested for (i = 0; i < l.length; i++) { A "master switch" is a switch which dominates the operation of contactors, relays, or other remotely The numerator in the number is the primary hook lifting height, and the denominator is the auxiliary hook lifting height. the handle from being inadvertently moved to the "on" position. "ANSI" means the American National Standards Institute. The hoist limit switch which controls the upper limit of travel of the load block shall never be used as an operating Lifting height(m): 3. fouled when the block is lying on the ground with ropes loose. var aCookie = dcsGetCookie(name).split(":"); Overhead and gantry cranes. They exclude delivery charges and customs … Occupational Safety & Health Administration, Regulations (Standards - 29 CFR) AICRANE, specializes in the design and manufacture of various heavy lifting equipment, including overhead cranes, gantry cranes, jib cranes, hoists, winches, travel lifts, etc. DC if (WT[N]) { WT.vt_f = "2"; until the controller handle is brought to the "off" position, or a reset switch or button is operated. Freedom of Information Act 125 percent when used with a control braking means other than mechanical. WT.co_f = gTempWtId;